projects - agriculture

project name Water And Power For “Kenka Kley” Farm
client Estancia Kenka Kley S.A.,
Mariano Roque Alonso (Paraguay),
Mr. Haertl, Martinsried (Germany)
location Estancia Kenka Kley, Department of Boquerón (Paraguay)
project duration begin december 1999
end may 2000
  print or save project sheet

In semiarid Paraguayan Chaco with temperatures of 45°C (113°F) reliable water supply is crucial for cattle farming.

The cattle farm “Kenka Klei S.A.” is located 80 km (50 miles) away from power lines counts and with 12,000 head cattle and extends over 28,000 hectare (70,000 acre).

The farm possesses various drilled wells exploiting the transborder aquifer system Yrendá. The groundwater is characterized by high sodium sulfite and chloride contents and ideal for cattle watering but requires special attention for corrosion resistant martials.

photovoltaic rack for solar pump

responsibilities

feasibility study and design for water and off-grid power supply, with following features:

  • water capture from drilled deep wells
  • photovoltaic solar pumps for water transport

cattles drinking well