project name | Extension of the existing hydrant pumping station in the tank farm at Munich Airport |
owner | Munich Airport Authority, Munich (Germany) |
location | Munich Airport, Munich (Germany) |
duration | start june 2013 end spring 2014 |
print or save project sheet |
The Munich airport undertakes an extended expansion program includ-ing the construction of a new terminal satellite building. To ensure prompt and effective aircraft service, aircraft fueling is provided by a hydrant fueling system. Fuel is pumped through buried pipelines from the airport tank farm to the distributed fuel hydrants on the airport’s aprons.
For the additional aircraft positions, the existing aviation fuel pumping station is extended by three additional pump lines.
Fuel pumping station at Munich Airport, final design rendering
activities
Design for three additional pumping lines for pumping of hazardous material (Jet A1) at the Munich Airport tank farm.
The services include organizational measures to safeguard construction process without interruption of the normal fueling operation.
The professional services encompass
wolf engineers + consultants provides engineering design for
technical description
illustrations
Clip of piping and instrumentation diagram (P&ID) of aviation jet fuel pumping station at Munich airport