project name | Khartoum New International Airport (KNIA) sanitation design |
owner | Project Implementation Unit for KNIA, Khartoum (Sudan) |
prime consultant | Dorsch Consult Airports, Munich (Germany) |
location | Khartoum (Sudan) |
project duration | begin october 2003 |
print or save project sheet |
The airport of Khartoum is located close to city center and a permanent peril. Possibilities for airport extension do not exist due to the rapid growing city.
The Presidency and its Project Implementation Unit for KNIA plan a new Greenfield airport, for 6.5 million passengers per year, some 40 km south of Khartoum.
water pumping station PIU compound
responsibilities
sanitation relevant contribution to airport site selection
master planning, design, specification writing for sanitation infrastructure:
Turn key tender preparation and bid evaluation acc. to FIDIC “silver book”
Construction tender preparation acc. to FIDIC “red book” for ground water transmission lines and wells
well head (t l, t c) well zone (t r), isolation valve chamber exterior (c l),)
isolation valve chamber interior (c c), pipeline marker post (c r), line vent (d l), fire hydrants (d r)
pipeline marker post (c r), line vent (d l), fire hydrants (d r)
White Nile at potable water transmission line White Nile crossing(d), ground water line PVC DN200 (8”) (t)