projects - water + sanitation

project name tissue factory fripa
waste water permit design
owner e.on wärme GmbH, Regensburg (Germany)
prime consultant RMD-consult, Munich (Germany)
location Miltenberg (Germany)
project duration

begin january 2008
end may 2008

  print or save project sheet

The tissue factory fripa is an important manufacturer of, mainly high quality hygienic tissues. Within a heat contracting framework E-ON installs and operates a gas turbine with waste heat steam generation, steam capacity of approx. 25 t/h (920 lb/min).

plan view power station building © rmd-consult

responsibilities

design for construction permit for waste water and drainage system